A two phase project consisting of deck and roof replacement.

 

Phase 1

Complete roof replacement using a cold process Firestone SBS roof system.

Roof removal and material loading occurred during the night hours only to lesson tenant disruption.

Debris was bagged, carried through protected hallways and elevators out to dump trucks at the loading dock. Trucks were moved nightly.

99% of the tenants in the largest building in downtown Stockton didn’t even know we were there.

The system was a multiple ply SBS modified bitumen system configured to last over 20 years. Cold process asphalt was used as the inter-ply adhesive and waterproofing agent. Black rubberized walk pads were installed to protect the new membrane from window washing equipment. The membrane was covered with aluminum coating to protect the membrane from harmful U.V. rays.

The Silver and Black roof installed in honor of the Oakland Raiders,  came with a full value 15 year warranty from Firestone Building Products.

 

Phase 2

Existing coating removal and bead-blasting started the application of a Neogard traffic bearing coating made to last over 20 years. These systems when properly cared for and recoated can last for more than 20 years.

Again, most of the disruption typical with these systems occurred at night. During day light hours, precautions were made to prevent fumes from entering the building.

Both phases occurred on time and within budget.